ISNetworld Score Simulator

The ISNetworld score determines whether your oilfield contracting company qualifies for work with major operators. Your grade depends on a weighted combination of RAVS (30-40% of score), 3-year rolling TRIR (approximately 30%), DART rate (20%), and other compliance factors. This free simulator shows your projected grade trajectory and how a single recordable incident impacts your score through the 3-year rolling average window.

Grade A: 85+ Points
RAVS: 30-40% Weight
3-Year Rolling Average
ISNetworld Score Simulator
Simulate your path to an ISNetworld "A" grade based on TRIR, DART, RAVS, and compliance factors. See how a single recordable impacts your 3-year rolling average.
1Enter metrics
2View projection

3-year rolling average from ISN

Days Away/Restricted/Transfer rate

Manual policy compliance % (30-40% of grade)

New recordables this year (affects 3-year projection)

Total employee hours per year

Optional: helps calibrate projection

Enter TRIR, DART, and RAVS score to simulate your grade

This simulator provides estimates based on common ISNetworld weighting factors. Actual grades depend on operator-specific criteria and may vary. RAVS typically accounts for 30-40% of your grade, while TRIR contributes approximately 30%. For precise calculations, consult your ISNetworld representative or use our TRIR Calculator.

How ISNetworld Grading Works

Grade Weighting Breakdown

RAVS: 30-40%Policy compliance
TRIR: ~30%3-year rolling
DART: ~20%Incident severity
Other: 10-20%EMR, training, insurance

Grade A Requirements

  • • TRIR below 0.8 (some operators: 0.5)
  • • RAVS score above 90%
  • • DART rate below 0.5
  • • Current insurance certificates
  • • Complete training documentation

Grade Variance Warning

"Grade Variance" occurs when your ISN grade differs from what metrics suggest. Low RAVS with good TRIR is the most common cause. Operators view this as a documentation red flag.

Understanding the 3-Year Rolling Average

A single recordable incident in 2024 affects your ISNetworld TRIR through the end of 2026. Here's how the math works for a contractor with 200,000 annual hours:

Scenario2024202520262027
Zero recordables0.000.000.000.00
1 recordable in 20240.330.330.330.00
2 recordables in 20240.670.670.670.00

Formula: TRIR = (Recordables × 200,000) ÷ (Annual Hours × 3 years)

Your Path to ISNetworld Grade A

1

Maximize RAVS

Complete all policy uploads and verification items. RAVS improvement shows results in 30-60 days.

2

Prevent Recordables

One prevented recordable is worth more than months of documentation improvements.

3

Track Real-Time

Monitor your metrics continuously so you know before crossing operator thresholds.

Frequently Asked Questions

ISNetworld grades are calculated using a weighted combination of factors. RAVS (Review and Verification Services) typically accounts for 30-40% of your grade, measuring policy compliance and documentation quality. Your 3-year rolling TRIR contributes approximately 30%, while DART rate adds another 20%. The remaining 10-20% comes from factors like EMR, training compliance, and insurance verification. Each operator can customize which factors matter most for their specific requirements.

Track Your ISNetworld Score Automatically

BasinCheck calculates your TRIR and DART in real-time as incidents happen. Get alerts before you cross operator thresholds and generate ISNetworld-ready exports with one click.