Free safety resource

LNG Proposed-Rule Readiness Tracker

Make sense of the proposed PHMSA LNG rule and organize the records and follow-up your team needs to review.

Editable Excel Source references

PHMSA’s November 2026 rule is a proposal. This tracker covers selected topics and is not a complete compliance assessment.

Inside the workbookIllustrative preview

Readiness tracker

Selected review topics

TopicApplicability
Plans and proceduresTo determine
Training recordsTo determine
Fire protection controlsTo determine

Get the tracker

Editable workbook with prompts, sources, and action fields.

We’ll use your email to deliver this resource. See our privacy policy for details.

A closer look

A starting point for your LNG rule review.

The workbook organizes selected operational record topics so a reviewer can connect source text with what the facility already has and what still needs attention.

Readiness tracker

15 selected topics with applicability, evidence, action, owner, and review fields.

Read first

Scope, instructions, and source links for checking the current and proposed text.

How to use it

Turn source text into a review your team can follow.

01

Determine applicability

Identify the facility and responsible operator. A qualified reviewer decides which rules and proposed provisions apply.

02

Review your records

Compare selected topics with your existing procedures, training records, test logs, and supporting evidence.

03

Assign follow-up

Record gaps, owners, target dates, and reviewer notes. Revisit the tracker as the rulemaking progresses.

Regulatory context

Review the rules for your facility

Have a qualified safety professional review the resource and current source text for your facility. It does not replace site procedures, engineering review, or a determination of compliance.

Proposed rule

PHMSA published the proposed LNG rule on November 3, 2026. The proposal is not a final rule. Current Part 193 and other requirements may apply depending on the facility. The proposed alternative Subpart F program has specific eligibility and election conditions.

Good to know

Frequently asked questions

Is the PHMSA LNG proposal in effect?

No. PHMSA published a proposed rule on November 3, 2026. Check the docket for updates and use the current regulations when determining present obligations.

Does the tracker cover all LNG requirements?

No. It covers selected operational record and review topics. Your team must check all requirements that apply to the facility, including engineering, design, and other topics outside this tracker.

Does proposed Subpart F apply to every LNG facility?

No. It is a proposed alternative framework for qualifying FERC-jurisdictional facilities that elect it, subject to conditions and an implementation plan.

Keep findings and follow-up together

BasinCheck helps field teams document inspections and track corrective actions.

See how BasinCheck works

Also useful: management of change template and the free JSA builder.