Match it to your site
Remove equipment you do not have and add what is missing. A pumping unit on electricity needs a shorter list than a site with a compressor.
Walking the location is the easy part of an AVO inspection. The hard part comes months later, when you have to show that every visit happened and every leak was repaired. This checklist covers the equipment a pumper checks by ear, eye, and nose, and keeps each leak tied to its repair.
AVO Leak Inspection
AVO Leak Inspection
Field status
Saved offline · syncs on reconnect
Interactive checklist
0 of 10 checked
Field workflow
Remove equipment you do not have and add what is missing. A pumping unit on electricity needs a shorter list than a site with a compressor.
Listen, look, and smell at each piece of equipment. Carry your gas monitor and follow your H2S procedures. No reading is worth an exposure.
Submit the inspection even when you find no leaks. A clean inspection with a date and a name is still evidence.
Give every leak an owner and a due date inside your repair deadline. Record the first attempt and the finished repair.
Built for the job
An AVO record has to answer four questions later: who inspected, where, when, and what happened to each leak.
Company, location or pad name, county, coordinates if your plan calls for them, inspector name, and the date and time of the walk.
Valves, connectors, flanges, flowlines, separators, heater treaters, meter runs, and dump valves that may be stuck open.
Thief hatches closed and seated, gaskets intact, and no vapor or odor at vent lines, relief valves, or piping to the control device.
Pilot flame present, control device working, and no process controller or pneumatic pump stuck venting.
The component, the date of the first repair attempt, whether it worked, the date the repair was finished, and the reason for any delay.
Anything skipped because it was unsafe or difficult to reach, named on the record so the office knows what the visit did not cover.
Compliance & proof
EPA's fugitive emissions rules for oil and gas well sites, 40 CFR Part 60 Subparts OOOOb and OOOOc, rely on AVO inspections at many sites. A proposal published on October 29, 2026 would set quarterly AVO inspections as the fugitive emissions standard for marginal well sites, which it defines as sites producing 15 barrels of oil equivalent per day or less. EPA also proposed a second option that applies the same standard to conventional well sites, and it could finalize either one. Until EPA finalizes a rule, the current schedule applies. Check your own obligations with your environmental advisor.
It does not replace your fugitive emissions monitoring plan or the rule text. Survey frequency and repair deadlines depend on your site type and on which subpart applies.
Questions from the field
BasinCheck saves each AVO inspection with the inspector, time, and location, works without signal, and turns every leak into a corrective action with an owner and a due date.
In BasinCheck
Inspection and JSA connected
Failed item assigned and tracked
Evidence retained for review