New in BasinCheck
Permit to Work, request to closeout
Request, issue, and sign off hot work, confined space, line breaking, and LOTO permits in the same place you run audits and JSAs. Here is the whole flow in 40 seconds.
Request to closeout in one place
Contractors submit permit requests from their phone at the gate. Every permit lives in one register with a full event trail.
Critical-control gates
Gas tests, isolations, and critical controls are checked before a permit can go active — the same gates as the paper permit, enforced.
Every signature captured
Issuer, area authority, receiver, and fire watch sign off digitally. The permit goes live only when the signoffs are complete.
Look around free, no trial needed
Click through every feature and create real audits, inspections, JSAs, and permits before you pick a plan.